Name is required.
Email address is required.
Invalid email address
Answer is required.
Exceeding max length of 5KB

Job dependency in scheduling

Hi , I'd like to a keep an job dependency on orchestration job. Lets say I have an orchestration job job1 and that job will trigger every day at 4 AM EST. Once that job completed then I need to run another orchestration job2 and after I need run orchestration job - job3 once the job2 completed. How can we achieve this in Matillion scheduling without using SQS ? I know I create one more job4 there I can link job1, job2 and job3 but I don't want create another job just to keeping the dependency. Is there any way to do that?

1 Community Answers

Matillion Agent  

Ian Funnell —

Hi Riaz,

The job dependency metadata can be captured in a parent job. So a way to do this without using SQS (or equivalent) might be to have a parent Orchestration Job, which calls job1, then job2 (upon success), then job3 (upon success).

You would then schedule the parent job to start at 4am.

Best regards,
Ian

Post Your Community Answer

To add an answer please login